Constructed a 2 mile, 10’ wide limestone trail. Drove pilings and built concrete piers for three pedestrian bridges interconnecting an island and mainland. Bridge installation included 4 spans 50’x8’; 3 spans 60’x8’; 1span 50’x10’. A floating barge was used to access the pilings and move the crane to various locations.